• PELZER PIMSA AUTOMOTIVE INC. (GOLCUK / KOCAELI)
    2016-2020Mechanical maintenance and repair projects
    2016In the scope of commissioning the new presses; manufacture & assembly of system’s hot oil, steam and air installation in the system and isolation application project
    2005-2015Machine assembly, ventilation, steel construction and isolation works on the hot oil lines at Gölcük and Gebze plants
    2014Log press installation works
    2013Dismantle of installations available inside Gölcük Ford complex and Aygen, assembly of cooling water line and shelter and basement ventilation systems
    2012HMP3.2. line installations, plant exhaust stack outlet alterations
    2011Manufacture and assembly for 400 ton press steam line
  • PAILLANT INC.
    2012Paint shop roof alteration at Hyundai plant, manufacture and assembly of exhaust lines of the furnaces that will be extended, covering the cabinets with sandwich panel
  • LEAR CORPORATİON
    2013

    Dismantle of the steel racks available inside installations in Ford complex

  • KANCA MACHINE INC.
    2014Revision of Tofaş cases at Şekerpınar (Taysad) factory
  • TOYOTA MOTOR MANUFACTURING TURKEY
    2005Manufacture and assembly of the plant’s steel construction
  • FAURECIA POLIFLEKS INC.
    2013Plant dismantling works
  • GOODYEAR TIRES INDUSTRY INC. (IZMIT FACTORY)
    2011Modification Works for Pigment room, across plant various maintenance works
  • FORD AUTOMOTIVE INC.
    2012Closing Mpr 12/13 press floors in the press section at Ford Otosan Gölcük Facilities
    2011Paint shop modification works
  • DÜRR
    2014DÜRR Germany; in the scope of capacity increase project ; manufacture and assembly of HA0S CC, BC primary cabin suspending system , HA0S paint shop and robot chassis modifications & ventilation systems alteration
    2013DÜRR Germany; in the scope of capacity increase project ; robot base plate works, cabinet reinforcement works, floor platform reinforcement and cabinet suspending system reinforcement in the paint shop
    2013DÜRR Korea; complete manufacture, assembly and commissioning of the plant in the scope of RTO System
  • HYUNDAI ASSAN AUTOMOTIVE INDUSTRY AND TRADE CO. INC.
    2019-2020Various Mechanical maintenance and repair works
    2019Fire station alterations and maintenance repair works –mechanical installation works for Elmalık sprinkler pool
    2018TProject design, manufacture and assembly of EMS station’s cat ladder and walkways
    Project of pipeline to transport the grey treated water to the water treatment section
    2017Depr…. works and isolation on the chiller line available in the mould press area
    2014RTO disassembly work, installation of backwash unit for plate exchangers of degreasing tanks no 1 and 2 on Pt line
    2013In the scope of capacity increase project ; installation of magnetic filter in the water test pool, revision assembly of the fire collector, pipe and equipment revision of waste water pools, changing the air compressors and pipes, assembly of additional motor to the paint shop elevators
    2012Manufacture of turn table no 04
    2006Assembly of pain shop robots, manufacture and assembly of installations
  • PIMSA ADLER AUTOMOTIVE INC.
    2018Project design of piping and ventilation installations
    2017Air installation Project for the car trunk side assembly line; mechanical installation works for the new door nylon’s thermo form machine. Mechanical installation Works for casting press on the cabinet line, mechanical project design for the 2nd Plant
    2016In the scope of the new plant investment, manufacture & assembly of system’s hot oil, steam, air and water installation and isolation application project
  • FARAERO & FARFORM AUTOMOTIVE SINGING. INC.
    2017Hydrate system changing project for fire lines; mechanical installation works required fort he new press
    2016Manufacture and assembly of the plant’s complete compressed air lines and cooling water lines (2016)
  • TOYOTA BOSHOKU
    2019Manufacture of sheet anker for slag conveying containers
    2016-2019Mechanical maintenance and repair projects
    2017Renewal and project design for cooling water lines of Injection Machines
    2015-2016Various mechanical maintenance and industrial installation works (2015-16)