• BRISA BRIDGESTONE SABANCI TUBE INDUSTRY AND TRADE INC.
    2016-2020Mechanical maintenance and repair projects
    2019Manufacture and assembly works for MIXER 8-9 carbon transfer lines
    2017In the scope of Mixer 10 project, mechanical installation, air channels and isolation work project
    2017Project for taking the water lines through galvanized pipes into the plant at BRİSA/AKSARAY Plant
    2016-2017Dismantle of Steam Boiler no 2&3 and Stack; Tent site fire fighting equipment project, In the scope of the new plant investment, Aksaray Plant; manufacture & assembly of the installations, with supply of materials, of Chiller, Tread, Sidewall, Filler, Wa Mill, Gum Calender, Dieman Oce, Case Preset, cross cutting, bead filler, Tire Building, Textile Calender, Painting and calendared fabric slicing machines and isolation application projects (~ 5.000 m)
    2007-2015Revision and maintenance works for machine maintenance works, tank and pipe lines
    2015New press branch ducts of Za-zb press channel, assembly of academy cooling tower, displacement, dismantle and assembly of G1-G2 presses
    2014New press branch ducts for Za-Zb press channels, dismantle and assembly of fire line behind boiler room
    2013-2015Z07 cable train modification
    2013Manufacture of 9 set of U line hydraulic group, piping following Zf8-9 presses group
    2012Replacement of boiler room compressors and lines with stainless pipe, alteration of fab2 press end pump pit, manufacture and assembly of mixer 9 pipe lines, installation of chiller system and installing heating line to the apparatus line, vacuum curing press piping works
  • CHEMETALL
    2018Reactor maintenance works
  • EGE KİMYA
    2019Manufacture of PE Tank with 2m3 mixer
    2018Manufacture and assembly of 25m3 mixer tank
    2018Manufacture and assembly of 41m3 mixer buer tank
    2018Manufacture and assembly of 400m3 Silicate tank
    2018Manufacture of 2m3 sweeping tank
  • KORDSA GLOBAL INDUSTRIAL IPLIK AND CORD BEHIND INDUSTRY AND TRADE INC.
    2019-2020Manufacture and assembly work for cyclone steel and ventilation channel for test building, assembly of heating and air conditioning products
    2019Piping Works for Line-2 tank site cooling water, running water, air, steam, nitrogen main lines
    2019Manufacture and assembly Works for condensation lines
    2017-2018Mechanical maintenance and repair projects
    2018NY-fabric unit raw water, soft water line dismantling-assembly works
    2018SSP building maintenance, monorail assembly and PP line maintenance works
    2018Manufacture and assembly of the fire and sprinkler water lines around the new warehouse
    2017

    NYI Line 2 and PET lines; engineering study Project for the additional Steam & Condensation Installations

    2016Manufacture and assembly of the tubular exchanger
    2014Manufacture and assembly of and supporting with the steel construction the new T25 12” dow feeding line
  • STOPER
    2017-2020Mechanical maintenance and repair projects
    2017

    Installing shingle production line and mechanical installation works project in this scope; manufacture and assembly of hood and ventilation lines; manufacture and assembly of conveying helix for calcite silos; maintenance of asphalt tank’s exchanger and maintenance of lines

  • B PLAS INC.
    2005-2016Machine assembly, manufacture and assembly of compressed air lines and roof
    2013Manufacture of B460 front bumper stand
    2012Carrying V 347 assembly line, V227 line; alterations of Ford complex chiller lines
  • PAPCHEM PAINT AND CHEMICAL MATERIALS INDUSTRY AND TRADE INC.
    2019Mounting a weighing system to retention system
    2016Project design, manufacture and assembly of retention system which is used at Paper Plant
  • STAR RAFİNERİ
    2019Manufacture of UM carrying container with ADR (8 pcs)
  • BASF
    2019Various maintenance and repair works
  • POLISAN INDUSTRY AND TRADE INC.
    2018Performing engineering works for moving filling stations no 13 and 14
    2017Performing engineering works needed to move 13 tanks in the tank farm to the new filling area no 12-14, performing surge analysis for 13 tanks available in the tank farm, tanker filling platform project
  • GUNFALT CONSTRUCTION TRADE LTD.
    2006-2010Manufacture of steel construction tank, piping and isolation works
  • SHELL PETROEUM INC. (Kocaeli, TURKEY)
    2008

    Revision and isolation Works for natural gas cycle of power plant chimneys, revision and isolations for hot oil boilers, boiler flues

  • TEKPOL TECHNICAL POLYURETHANE INDUSTRY AND TRADE INC.
    2016Assembly of cooling tower and cooling water installation works
    2015Moving Kurtköy plant to Taysad plant; manufacture and assembly of Tekpol partition wall
    2014Manufacture of battery charging room
    2013Manufacture of Pentan tank, 30m3
    2012Manufacture of crystallization tower
  • DİVERSEY
    2014-2015Thickness measurement of tanks
  • AKSA ACRYLIC CHEMISTRY TRD. INC.
    2017-2018Project for dismantling the foam lines in the tank site with cold cutting method
    2016 Project for dismantling Naphtha and Fuel Oil Lines with cold cutting method
  • PROSIM CHEMISTRY INDUSTRY AND TRADE LTD.
    2016Joint Installation, substructure installation, VRF Air Conditioning Installation, Ventilation Installation Works
  • TUPRAS INC.
    2016-2017Overall Pipe and Steel Construction Works at İzmit Refinery