• ADOÇİM
    2018Installation of 86 m³ single-walled ammonia tank manufacturing under the SCNR system; assembly of the tank and the preheater tower with the accompanying escort line; overseas delivery material installation and commissioning 
  • VOTORANTİM ÇİMENTO
    2018Flame pipe anchor manufacture
    Honeycomb anchor manufacturing
  • LİMAK - BALIKESİR
    2018Installation of 75 m³ double-walled ammonia tank manufacturing under the SCNR system; assembly of the tank and the preheater tower with the accompanying escort line; overseas delivery material installation and commissioning 
  • LİMAK - TRAKYA
    2018Installation of 150 m³ double-walled ammonia tank manufacturing under the SCNR system; assembly of the tank and the preheater tower with the accompanying escort line; overseas delivery material installation and commissioning 
  • LİMAK - URFA
    2018Installation of 150 m³ double-walled ammonia tank manufacturing under the SCNR system; assembly of the tank and the preheater tower with the accompanying escort line; overseas delivery material installation and commissioning 
  • ADANA ÇİMENTO
    2018Flame pipe anchor manufacture
  • FLSMIDTH
    2018Manufacture of drag chain conveyor
  • CIMSA CEMENT INDUSTRY AND TRADE INC. - KAYSERİ
    2018Under the SNCR system; assembly of the tank and the preheater tower with the accompanying escort line; overseas delivery material installation and commissioning 
  • AKÇANSA - ÇANAKKALE
    2018Under the revision of the furnace; WHR gas ducts maintenance, repair and isolation works
    Installation of 200 m³ single-walled ammonia tank manufacturing under the SNCR system; assembly of the tank and the preheater tower with the accompanying escort line; overseas delivery material installation and commissioning 
  • AKÇANSA - SAMSUN,LADİK
    2018Installation of 100 m³ single-walled ammonia tank manufacturing under the scnr system; assembly of the tank and the preheater tower with the accompanying escort line; overseas delivery material installation and commissioning
  • CIMENTAS IZMIR CEMENT FACTORY INC. (ELAZIG PLANT)
    2017-2018FLSmidth Subcontractor; In the scope of SNCR System, 100m³ Ammonia Tank, projecting, manufacturing and installation, ammonia installation between tank and preheater tower, all construction works of tank base and tank pool, electrical and automation works of system (TUR-KEY)
  • BATICIM BATI ANADOLU CEMENT IND.
    2017Renewal of filter suction pipes
  • CIMENTAS IZMIR CIMENTO FACTORY INC. (TRAKYA PLANT)
    2017-2018FLSmidth In Subloader; Within the scope of the SNR System, 100m³ Ammonia Tank, projecting, manufacturing and installation, ammonia installation between tank and preheater tower, all construction works of tank base and tank pool, electrical and automation works of the system (TUR-KEY)
  • GUBRETAS FERTILIZER FACTORIES INC.
    2017-2018Yarımca Facilities; 2017 planned maintenance and revision applications
    2014-201570 ton steel construction projecting, manufacturing and assembly
    2013Galvanizing sheet work
    2005-2011NPK1, NPK2 and TSP pipes, manufacture and installation of steel construction, conveyor, cyclone suction lines
    2010NPK1 washing tower steel construction, projecting, manufacturing
  • NUH CEMENT INC.
    2018Flame pipe anchor manufacture, and sludge drying exchangers repair and maintenance 
    2016Oven 3 Process Water Line Renewal Project
    2015WHR unit pipeline modification, mud drier heat exchanger manufacturing and modification, oven 3 pump room and tower high pressure pipeline work
    2014WHR facility transmiter lines AISI316 pipe overhaul 150 m³ double-wall ammonia tank under the SNCR system, design-manufacture- erection and installation and installation of tank-tower installations
    2013Dismantling and erection of chimney-side heat exchanger in sludge drying plant, isolation and pipeline work
    2012Production and installation of factory general fire lines
    2011Revision of fuel oil lines
    2008-2009Sludge drying line, 1500 m. 6 '' hot oil line manufacturing and installation, insulation works
    2006-2007Silo b
  • AKCANSA CEMENT INDUSTRY AND TRADE. INC.
    2016-2017Akçansa Ambarlı Cement Terminal, Pipeline renovation project
    2015Design and manufacturing of 150 m³ single-walled ammoniac tank under the SNCR system, installation and assembly of tank-tower installations and installation
    2017Akçansa Ambarlı Cement Terminal, Pipeline Renewal Project
  • MEDCEM MINING AND CONSTRUCTION MATERIALS INC.
    2015As the main contractor; Manufacture, installation and isolation of all industrial plants of the plant including material (~ 40,000 m)
    2015Design and manufacturing of 200 m³ double-walled ammonia tank under the SNCR system, installation and assembly of tank-tower installations
    2013Well water line manufacturing and assembly work
  • CIMSA CEMENT INDUSTRY AND TRADE INC. - AFYON
    2016-2017Manufacture and assembly of 110 m³ Ammonia Tank production and assembly lines between tank and preheater tower within the scope of SNCR System.
  • BATISOKE SOKE CEMENT INDUSTRY AND TRADE. INC.
    2016Production and installation of 100 m³ Ammonia Tank and assembly and assembly of tank- preheater towers within the scope of SNCR System 1-2- 3-4 Fire Line Manufacturing and Installation
    2017WHR Plant Pipe Revisions, silencer assemblies and KD2 CO2 installation works
    2017Cement Mill 5 Roller Press Unit Mechanical production and assembly
  • SYCS GROUP INC.
    2016Subcontracting of Bilim Makine A.Ş; Manufacture and installation of factory’s entire cooling water lines, fuel-oil and hot oil lines, steam and condensate lines, fire lines, air lines (~ 25,000 m)
  • NUH BUILDING PRODUCTS INC.
    2017

    Thermal oil heat exchanger mechanical maintenance and repair

    Establishment of environmental waters collection system, mechanical installations in this context

    201625m³ / h Installation of sand filter and equipments and installation works within system