• GUBRETAS FERTILIZER FACTORIES INC.
    2019Yarımca Plant, NPK 1B Drying eqipment’s gear direction changing project
    2019Various maintenance and repair works
    2017-2018Yarımca Facilities; Scheduled Maintenance and Revision Application in 2017
    2014-2015Project design, manufacture and assembly of 70 ton steel construction
    2013Galvanized sheet covering works
    2005-2011Manufacture and assembly of pipe, steel construction, conveyor, cyclone suction lines in NPK1, NPK2 and TSP units
    2010Project design, manufacture and assembly of NPK1 scrubber’s steel construction
  • NUH CEMENT INC.
    2019Various Mechanical maintenance and repair works
    2018Anker manufacture of flame tube and repair and maintenance services for sludge drying exchangers
    2016Furnace 3, Process Water Line Renewal Project
    2015WHR unit pipe line alteration, manufacture and modification of sludge drying exchanger, high pressure pipe line between pump room and tower on furnace 3
    2014Revision of WHR plant transmitter lines with AISI316 pipe, design, manufacture and assembly of double walled ammonia tank of 150 m3 in the scope of SNCR system, manufacture and assembly of tank to power installations
    2013Dismantle-assembly of exchanger on stack side in sludge drying plant, and isolation and pipe line works
    2012Manufacture and assembly of across plant fire lines
    2011Revision of fuel oil lines
    2008-2009Manufacture and assembly of 1500 m. 6” hot oil line of sludge drying line; isolation works
    2006-2007Manufacture and assembly and isolation of Silo pipe lines, silo fans Manufacture and assembly and isolation of Silo pipe lines, silo fans
  • FLSMIDTH
    2018-2020Drag chain conveyor manufacture
  • AKCANSA CEMENT INDUSTRY AND TRADE. INC.
    2019-2020Farin pipe manufacturing – Manufacture of waste gas fan piping – Manufacture of 1st furnace stack
    2016-2017Akçansa Cement Terminal in Ambarlı, Pipe line Renewal Project
    2015Design, manufacture and assembly of single walled ammonia tank of 150 m3 in the scope of SNCR system; manufacture and assembly of tank to power installations
    2017Manufacture and Assembly Project for Akçansa Ambarlı Cement Terminal, Pipe Line Renewal and Cement
    Transfer Line Elbows and Assembly Project
  • AKÇANSA - SAMSUN,LADİK
    2018Manufacture – assembly of 100 m3 single walled ammonia tank in the scope of SNCR system –and manufacture and assembly of accompanying lines between tank preliminary heater and tower, assembly and commissioning of materials delivered abroad
  • AKÇANSA - ÇANAKKALE
    2018Manufacture and assembly works for chute modernisation in the scope of revision works 2019 Technological manufacture and assembly of A-B&H SILO – manufacture of compensator of hot gas channels (12 pcs)
    2018Maintenance, repair and isolation of WHR gas channels in the scope of 1st furnace revision
    2018Manufacture – assembly of 200 m3 single walled ammonia tank in the scope of SNCR system and manufacture – assembly of accompanying lines between tank preliminary heater and tower, manufacture and assembly of pool steel roof, assembly and commissioning of materials delivered abroad
  • BATISOKE SOKE CEMENT INDUSTRY AND TRADE. INC.
    2019Flame tube anker manufacture and welding with rapid arc welding method
    2018Manufacture-assembly of ash pipe line
    2017WHR Plant Pipe Bridge Revisions, Muer Assembly and KD2 CO2 Installation Works
    2017Mechanical manufacture and assembly of 5 Roller Press Units on Cement Mill,
    2016In the scope of SNCR system; manufacture and assembly of 100 m3 Ammonia Tank and manufacture – assembly of accompanying lines between tank preliminary heater and tower; manufacture and assembly of packaging 1-2-3-4 fire line
  • Soma Çimento
    2019Honeycomb anker manufactures
  • ADOÇİM - TOKAT
    2018In the scope of SNCR system; manufacture and assembly of of 86m3 single walled ammonia tank and manufacture and assembly of accompanying lines between tank preliminary heater and tower, assembly and commissioning of materials delivered abroad
  • ADOÇİM - TRAKYA
    2020Furnace revision, mechanical maintenance and repair works
  • VOTORANTİM ÇİMENTO
    2018Flame tube anker manufacture
    Honeycomb anker manufacture
  • LİMAK - BALIKESİR
    2018In the scope of SNCR system; manufacture and assembly of 75 m3 double walled ammonia tank and manufacture and assembly of accompanying lines between tank preliminary heater and tower, assembly and commissioning of materials delivered abroad
  • LİMAK - TRAKYA
    2018In the scope of SNCR system; manufacture and assembly of 150 m3 double walled ammonia tank and manufacture and assembly of accompanying lines between tank preliminary heater and tower, assembly and commissioning of materials delivered abroad
  • LİMAK - URFA
    2018In the scope of SNCR system; manufacture and assembly of 150 m3 double walled ammonia tank and manufacture and assembly of accompanying lines between tank preliminary heater and tower, assembly and commissioning of materials delivered abroad
  • ADANA ÇİMENTO
    2017-2018Under subcontracting of FLSmidth; in the scope of SNCR system, project design, manufacture and assembly of 100 m3 Ammonia Tank, providing the ammonia installation between tank preliminary heater and tower, all construction Works for tank foundation and tank pool, system related electrical and automation works (TURNKEY)
  • CIMSA CEMENT INDUSTRY AND TRADE INC. - KAYSERİ
    2018In the scope of SNCR system; manufacture and assembly of accompanying lines between tank and preliminary heater, assembly and commissioning of materials delivered abroad
  • CIMENTAS IZMIR CEMENT FACTORY INC. (ELAZIG PLANT)
    2017-2018Under subcontracting of FLSmidth; in the scope of SNCR system, project design, manufacture and assembly of 100 m3 Ammonia Tank, providing the ammonia installation between tank preliminary heater and tower, all construction Works for tank foundation and tank pool, system related electrical and automation works (TURNKEY)
  • BATICIM BATI ANADOLU CEMENT IND.
    2017Renewal of filter suction pipes
  • CIMENTAS IZMIR CIMENTO FACTORY INC. (TRAKYA PLANT)
    2017-2018FLSmidth In Subloader; Within the scope of the SNR System, 100m³ Ammonia Tank, projecting, manufacturing and installation, ammonia installation between tank and preheater tower, all construction works of tank base and tank pool, electrical and automation works of the system (TUR-KEY)
  • MEDCEM MINING AND CONSTRUCTION MATERIALS INC.
    2015As main contractor; manufacture, assembly and isolation including material of the complete industrial installations of the factory (~40.000 m)
    2015In the scope of SNCR system; design, manufacture and assembly of 200 m3 double walled ammonia tank and manufacture and assembly of installations between tank and tower
    2013Manufacture and assembly of well water line
  • CIMSA CEMENT INDUSTRY AND TRADE INC. - AFYON
    2016-2017In the scope of SNCR system; manufacture and assembly of 110 m3 Ammonia Tank and manufacture and assembly of accompanying lines between tank and preliminary heater
  • SYCS GROUP INC.
    2016Under subcontracting of Bilim Makine A.Ş.; manufacture and assembly including supply of materials of complete cooling water lines, fuel-oil and hot oil lines, steam and condensation lines, fire lines, overhead lines (~25.000m)
  • NUH BUILDING PRODUCTS INC.
    2017Hot oil excharger’s mechanical maintenance and alterations
    Building system for environmental water collection, mechanical installation Works in this scope
    2016Set up of 25m3/h Sand filter and equipment and installation Works in the scope of system